20231205-ACoreLavs3rdFloo02r

A Core 3rd floor toilets area - work in progress
See full size image
Caption: A Core 3rd floor toilets area - work in progress
Description: A Core 3rd floor toilets area - work in progress. Gents' toilet on the left and ladies on the right, The WC pans had their back to the tiled between, which contained the cisterns and the associated waste and water supply pipes.
Alt text: A Core 3rd floor toilets area - work in progress
Image credit: Gary Tull
Photo subject date: 05/12/2023

20231205-ACoreLavs3rdFloo02r

A Core 3rd floor toilets area – work in progress. Gents’ toilet on the left and ladies on the right, The WC pans had their back to the tiled between, which contained the cisterns and the associated waste and water supply pipes.

Leave a Reply

Your email address will not be published. Required fields are marked *