A Core, 5th floor after asbestos removal and removal of the metal false ceiling, the asbestos appears to have been in the bulkheads between the lobbies and offices so would not have been disturbed during the building’s normal working life. The wood and glass partition between the stairwell and lift lobby also had ACM stickers on it, which is why there was no longer any partition here.
5-ACore-7544 |
See full size image Caption: A Core, 5th floor after asbestos removal and removal of the metal false ceiling, the asbestos appears to have been in the bulkheads between the lobbies and offices so would not have been disturbed during the building's normal working life. The wood and glass partition between the stairwell and lift lobby also had ACM stickers on it, which is why there was no longer any partition here. Description: A Core, 5th floor after asbestos removal and removal of the metal false ceiling, the asbestos appears to have been in the bulkheads between the lobbies and offices so would not have been disturbed during the building's normal working life. The wood and glass partition between the stairwell and lift lobby also had ACM stickers on it, which is why there was no longer any partition here. Alt text: A Core, 5th floor and stairwell after asbestos removal Image credit: Team Urbex - ATF Photo subject date: 15/04/2012 |