C602 in the process of internal strip-out. The plastic tubing came from the specialist asbestos ventilation unit as E core 5th and 6th floor lift lobbies were sealed off for for asbestos removal; obviously the Urbex team gave these areas a wide berth!
6-C602-7639 |
See full size image Caption: C602 in the process of internal strip-out. The plastic tubing came from the specialist asbestos ventilation unit as E core 5th and 6th floor lift lobbies were sealed off for for asbestos removal; obviously the Urbex team gave these areas a wide berth! Description: C602 in the process of internal strip-out. The plastic tubing came from the specialist asbestos ventilation unit as E core 5th and 6th floor lift lobbies were sealed off for for asbestos removal; obviously the Urbex team gave these areas a wide berth! Alt text: C602 in the process of internal strip-out Image credit: Team Urbex - ATF Photo subject date: 15/04/2012 |