W407 rooftop air conditioning plant room, to the left is the 6th floor stair lobby at K core. Not sure what happened to the floor. The area beyond the plasterboard was recently fitted out as a UPS battery room to improve the resilience of the vital computer operations, as well as generator and offsite contingency servers etc.
6-FCorePlantRoom-7688 |
See full size image Caption: W407 rooftop air conditioning plant room - entrance Description: W407 rooftop air conditioning plant room, to the left is the 6th floor stair lobby at K core. Not sure what happened to the floor. The area beyond the plasterboard was recently fitted out as a UPS battery room to improve the resilience of the vital computer operations, as well as generator and offsite contingency servers etc. Alt text: W407 rooftop air conditioning plant room - entrance Image credit: Team Urbex - ATF Photo subject date: 15/04/2012 |