DSC_2034-39

West Block demolition 2 Apr 2012
See full size image
Caption: West Block demolition 2 Apr 2012. Top floor W416 where ceiling was painted black about the suspended ceiling, W212 is below, which had a full suspended ceiling that reduced the height of the former double-height stores area and air conditioning was also installed. Below is the Bulk Map, store, W09 and on the LG floor W007, Map Issue & Despatch.
Description: West Block demolition 2 Apr 2012. on the 4th floor was W416 where the ceiling was painted black about the suspended ceiling, W212 is below which had a full suspended ceiling that reduced the height of the former double-height stores area by more than half. This allowed air conditioning to be installed, with the ducts etc out of sight above the ceiling. Below is the Bulk Map, store, W09 and on the LG floor W007, Map Issue & Despatch. Note the area at first floor level, I assumed it was a mezzanine floor but it looks like part of the concrete structure.
Alt text: West Block demolition 2 Apr 2012
Image credit: © Crown Copyright. All rights reserved.
Photo subject date: 02/04/2012

DSC_2034-39

West Block demolition 2 Apr 2012. on the 4th floor was W416 where the ceiling was painted black about the suspended ceiling, W212 is below which had a full suspended ceiling that reduced the height of the former double-height stores area by more than half. This allowed air conditioning to be installed, with the ducts etc out of sight above the ceiling.
Below is the Bulk Map, store, W09 and on the LG floor W007, Map Issue & Despatch. Note the area at first floor level, I assumed it was a mezzanine floor but it looks like part of the concrete structure.

Leave a Reply