4th floor central spur lobby, with toilets, stairwell 5 (K core) and fab lino flooring, 24 Sep 2011.
DSCF5175 |
See full size image Caption: K core 4th floor lobby, 24 Sep 2011 Description: 4th floor central spur lobby, with toilets, stairwell 5 (K core) and fab lino flooring, 24 Sep 2011. Alt text: K core 4th floor lobby, 24 Sep 2011 Image credit: Team Urbex - ATF Photo subject date: 24/09/2011 |