DSCF7417

Demolition of B-C spur – 11 Apr 2012
See full size image
Caption: Demolition of C-H spur, upper floors. The top floor (IS Service Desk I think) C633 had blue columns. Below was Research in C530, on the 4th floor was C433, PDU I think, and Corporate Office was on the 3rd floor in C335 and C343. The DG's office was in the N corner and there was the Boardroom and several interview rooms.
Description: Demolition of C-H spur, upper floors. The top floor (IS Service Desk I think) C633 had blue columns. Below was Research in C530, with its unusual office layout of a path varying from the grid layout of desk elsewhere on site. On the 4th floor was C433, PDU I think and the Corporate Office was on the 3rd floor in C335 and C343. The DG's office was in the N corner and there was the Boardroom and several interview rooms off the corridor.
Alt text: Demolition of B-C spur – 11 Apr 2012
Image credit: Gary Tull
Photo subject date: 11/04/2012

DSCF7417

Demolition of C-H spur, upper floors. The top floor (IS Service Desk I think) C633 had blue columns.
Below was Research in C530, with its unusual office layout of a path varying from the grid layout of desk elsewhere on site.
On the 4th floor was C433, PDU I think and the Corporate Office was on the 3rd floor in C335 and C343. The DG’s office was in the N corner and there was the Boardroom and several interview rooms off the corridor.

Leave a Reply

Your email address will not be published. Required fields are marked *