IMGP2009

Refrigeration Plant - electrical equipment
See full size image
Caption: Refrigeration Plant - electrical equipment
Description: NW end of Refrigeration Plant. On the left are Belmos Peebles control panels, on the right the chiller motor starter cabinets and the chillers themselves (downstairs) and in the centre, the main control console. The Belmos Peebles panels are laid out from left to right -the first four, bottom: Cooling Tower Fan 1, Cooling Tower Fan 2, Cooling Tower Fan 3, Cooling Tower Fan 4. The top panel on these four is blank. Next is, I assume, Chilled Water Pump 1 and 2 on the same column, to the right are Condense Pump no 1 and 2 and the smallest panels, second from right, are 'Lister battery charger and socket under stairs' (originally a spare), Sump Pump and Oil Pump.
Alt text: Refrigeration Plant - electrical equipment
Image credit: Gary Tull
Photo subject date: 18/08/2010

IMGP2009

NW end of Refrigeration Plant. On the left are Belmos Peebles control panels, on the right the chiller motor starter cabinets and the chillers themselves (downstairs) and in the centre, the main control console.
The Belmos Peebles panels are laid out from left to right -the first four, bottom: Cooling Tower Fan 1, Cooling Tower Fan 2, Cooling Tower Fan 3, Cooling Tower Fan 4. The top panel on these four is blank. Next is, I assume, Chilled Water Pump 1 and 2 on the same column, to the right are Condense Pump no 1 and 2 and the smallest panels, second from right, are ‘Lister battery charger and socket under stairs’ (originally a spare), Sump Pump and Oil Pump.

Leave a Reply

Your email address will not be published. Required fields are marked *