Refrigeration Plant, facing SE – chiller no. 3 viewed from LG floor level by the motor starter cabinets. The chillers themselves were a floor below LG floor level (a double-height space was needed to accommodate them). This part of the chiller was where the actual compression took place.
IMGP2011 |
See full size image Caption: York chiller no 3 viewed from above Description: Refrigeration Plant, facing SE - chiller no. 3 viewed from LG floor level by the motor starter cabinets. The chillers themselves were a floor below LG floor level (a double-height space was needed to accommodate them). This part of the chiller was where the actual compression took place. Alt text: York chiller no 3 viewed from above Image credit: Gary Tull Photo subject date: 18/08/2010 |